| Arts in Northbrook | |
| Asphalt Resurfacing - 2020 | This list is for updates on the asphalt resurfacing project scheduled for segments of Carol Court, Church Street, Illinois Road, Maple Avenue, Palm Lane, Pheasant Creek Drive, Ridgewood Drive, Sunset Lane and Sycamore Lane in summer 2020. |
| Brittany Road Stormwater/Water Main Combined Project - 2020 | This list is for those who are interested in receiving regular e-mail updates on the status of the Brittany Road Project (beginning in summer 2020). |
| Concrete Panel Replacement - Summer 2020 | This listserv is for residents living in and around the Sunset Fields subdivision that will be impacted by this summer's concrete panel replacement project in that subdivision. |
| Dundee Road Bridge/Culvert | Sign-up to receive regular email updates about the Dundee Road Bridge/Culvert Replacement Project. |
| Northbrook Newsletter | |
| Staff Test | test list |
| Surrey Lane Stormwater Project - 2020 | This project involves constructing stormwater improvements at the Surrey Lane cul-de-sac, including a conveyance storm sewer from the cul-de-sac to the Lee Road existing storm sewer and a low/flood overflow structure at the east side of the Surrey Lane cul-de-sac with a restrictor plate to relieve flooding. |
| Voltz Road Stormwater Project - 2020 | This project involves the installation of approximately 400 feet of new storm sewer from the intersection of Voltz Road and South Lane to the middle fork of the North Branch of the Chicago River along a drainage easement. This system will replace an older, deteriorated system that allows water to flood a nearby structure. The older system will be disconnected following construction of the new system.
|
| Wendy Drive Stormwater Project - 2020 | This project involves installation of inlet structures along Wendy Drive and the replacement of the existing storm sewer with a higher capacity main. |