Completed Stormwater Projects
This page includes a listing of all stormwater projects completed by the Village since 2017. Each project is named and includes the year of completion at the end to help you find historical information and updates on projects in the community. For current projects, please see the Road Construction Update page.
-
Blackthorn Lane Stormwater Project - 2019
This project involves improving the street drainage system on Blackthorn lane by increasing inlet capacity along the street and within the low street area.
Link to page -
Brittany Road Stormwater/Water Main Project - 2020
This project involves supplementing the existing storm sewer on Brittany with new sewer and installing new water main on Brittany between Bordeaux and Dauphine.
Link to page -
Sunset, Floral, Cedar Stormwater Project - 2021
This project involves reconstructing storm sewers and paved ditches on Sunset Trail, Landwehr Road, Floral Drive, and Cedar Court to reduce flooding at the intersection of Ridge Drive and Sunset Trail.
Link to page -
Dehne Road/Glendale Ave Stormwater Project - 2018
This project involves work at the intersection of Dehne Road and Glendale Avenue to increase swale capacity and reduce the impact of flooding at and near the intersection.
Link to page -
Dehne Subdivision Stormwater Project - 2019
This project involves replacement of the existing culverts and regarding along Dehne and Brentwood Roads.
Link to page -
Elm Ridge Drive Project - 2018
This project involves replacement of the existing concrete culvert under Elm Ridge Drive. These structures have begun to show signs of degradation and are in need of replacement.
Link to page -
First/Center Stormwater Project - 2021
This project involves constructing new storm sewers and water main on Center Avenue and First Street to reduce the frequency and intensity of localized flooding.
Link to page -
Keystone/Chartres Stormwater Project - Fall 2017
This project involves the construction of a new low-flow storm sewer system from Keystone Road to West Park. Get more details on the project page.
Link to page -
Longvalley Drive Stormwater Project - 2019
This project involves replacement of storm sewer at the intersection of Longvalley Drive and Longvalley Court.
Link to page -
Surrey Lane Stormwater Project - 2020
This project involves constructing stormwater improvements at the Surrey Lane cul-de-sac, including a conveyance storm sewer from the cul-de-sac to the Lee Road existing storm sewer and a low/flood overflow structure at the east side of the Surrey Lane cul-de-sac with a restrictor plate. Also, a relief swale will be constructed within the drainage easement. Two inlets will be added within the cul-de-sac area to improve drainage. A short segment of the Lee Road storm sewer system will be modified to accommodate the new storm sewer and flood overflow path. Currently, this area experiences cul-de-sac, front yard and rear yard flooding.
Link to page -
Voltz Road Stormwater Project - 2020
This project involves the installation of approximately 400 feet of new storm sewer from the intersection of Voltz Roadand South Lane to the middle fork of the North Branch of the Chicago River along a drainage easement. This system will replace an older, deteriorated system that allows water to flood a nearby structure. The older system will be disconnected following construction of the new system.
Link to page -
Wendy Drive Stormwater Project - 2020
This project involves installation of inlet structures along Wendy Drive and the replacement of the existing storm sewer with a higher capacity main.
Link to page -
Woodlawn Road Stormwater Project - 2018
This project involves work on the 2000 and 2100 blocks of Woodlawn Road, including adding inlets, regrading ditches and replacing driveway culverts.
Link to page